Hashtag
Men's Weekly

ENOC opens Service Station of the Future at Expo 2020 Dubai

DUBAI, UAE, Feb. 23, 2021 /PRNewswire/ -- ENOC Group, the Official Integrated Energy Partner of Expo 2020 Dubai, unveiled its innovatively designed Service Station of the Future, located at the Expo 2020 site.  

ENOC Service Station of the Future ENOC Service Station of the Future

In addition to supporting the logistical needs of Expo 2020's fleet ahead of the global event, it will serve the public at District 2020, the smart human-centric community that will become Expo's physical legacy after the event concludes on 31 March 2022.

The station is the world's first LEED Platinum certified and the region's first to incorporate on-grid wind turbine for power generation and carbon fibre in the construction of its canopy, with the design inspired by the ghaf, UAE's national tree.

Over 43,000m2/37 tonnes of carbon fibre have been used to build the 133 multi-layer canopy frame. The leaf-shaped ethylene tetrafluoroethylene cushion canopy is 100 per cent UV ray-protected and corrosion-proof, and illuminated with more than 3,800 LED light modules. The nine tree designs that support the station were built from another 22,500m2 of carbon fibre. Some 283 solar photovoltaic panels generate 143 MWh of solar power per year and a 25-metre wind turbine produce 12.7 MWh of wind energy annually.

Highlighting the group's aspirations to 'Reimagine Energy', HE Saif Humaid Al Falasi, Group CEO, ENOC, said: "Our role as Official Integrated Energy Partner for Expo 2020 Dubai provides us the opportunity to showcase our industry and country on the global stage. The station further underlines our participation at the event. The first-of-its-kind in the world which harnesses the power of renewables, it heralds a new era in fuel retail."

The station uses carbon filtration technologies to recycle grey water for irrigation, and has drinkable air units with ozonation techniques to convert water molecules from the air to drinkable water for staff. Machine learning, artificial intelligence and data analytics customise retail offerings, managing queue and waiting times at the forecourt, and improving the customer journey.  

Vehicle mapping surface lighting direct vehicles to the fuelling area, as well as entry and exits. Over 12 million LED chips illuminate the digital screens. For enhanced safety, the station uses advanced fuel management and gauging systems, providing 24-hour leak detection.  

ENOC recorded 400,000 manhours during the build process, with zero lost time injury, demonstrating its commitment to adhering to best practices in health, safety and environment.

Photo: https://mma.prnasia.com/media2/1442116/enoc_service_station_of_the_future.jpg?p=medium600  

Contact:  Srishti Soni  srishti.soni@bcw-global.com    +971 506473920

Authors: PR Newswire

Read more https://www.prnasia.com/story/archive/3286755_AE86755_0

Health & Wellness

Why Choosing a GP Bundoora Is Key to Consistent and Preventive Healthcare

Hashtag.net.au - avatar Hashtag.net.au

Access to dependable primary healthcare is essential for maintaining long-term wellbeing. Choosing a trusted GP Bundoora allows individuals and families to receive ongoing medical support close to h...

What Does an NDIS Support Coordinator Actually Do?

Hashtag.net.au - avatar Hashtag.net.au

The role of a support coordinator is often mentioned in NDIS conversations, but it isn’t always clearly understood. Many participants wonder what a support coordinator actually does day to day, and ho...

Why All on 4 Dental Implants Are a Life-Changing Solution for Full-Arch Tooth Replacement

Hashtag.net.au - avatar Hashtag.net.au

Severe tooth loss can affect far more than appearance. It can impact chewing ability, speech, facial structure, and overall confidence. For individuals missing most or all of their teeth, All on 4 D...